Preparation of Grid Code of Afghanistan including Capacity Building

Financials
Total Budget Spent
$664,509 $159,087
FY Budget Spent
$500,000 $0
 
Progress
Major Milestones
Overall Planned
Overall Actual
Overview
Current Status ongoing
Location Kabul
Funding Agency World Bank
Exp/Start Date 05-Aug-19
Contractual Completion Date 06-May-20
Expected Completion Date 06-May-20
Preparation of Grid Code of Afghanistan including Capacity Building
Project Description: To provide guidelines, rules and procedures, which ensure that all stake holders understand obligations placed upon them under the Grid Code. To lay down day-to-day and long-term principles, standards, procedures and guidelines for Planning, Operation, Dispatch, and Connection purposes for normal and abnormal transmission system conditions. To deal with the technical aspects of Transmission System covering the voltage range of HV and EHV levels such as 110 kV-132 kV, 220-230 kV, 400-500 kV or above. To establish the technical responsibilities of Generating Companies , Transmission Company/ies or System Operator/s. To regulate the Distribution System covering the voltage range of 35-22-15-10-60.4kV, Capacity building of MoEW and DABS in the
Donor: 3
Start Date: 2019-08-05
End Date: 2020-05-06
Location: Kabul
Physical Progress: 100.00%
Financial Progress: 23.94%
Progress Status: ongoing
Expected Results: To provide guidelines, rules and procedures, which ensure that all stake holders understand obligations placed upon them under the Grid Code. To lay down day-to-day and long-term principles, standards, procedures and guidelines for Planning, Operation, Dispatch, and Connection purposes for normal and abnormal transmission system conditions. To deal with the technical aspects of Transmission System covering the voltage range of HV and EHV levels such as 110 kV-132 kV, 220-230 kV, 400-500 kV or above. To establish the technical responsibilities of Generating Companies , Transmission Company/ies or System Operator/s. To regulate the Distribution System covering the voltage range of 35-22-15-10-60.4kV, Capacity building of MoEW and DABS in the